Had someone ask about a huge caulk job... Anybody do it?

Had someone inquire about recaulking all the joints of a big hospital. Anybody know anyone that does this type of work?

We do them.

Yeah you’d need/want some scaffold

We use a lift, it’s goes a lot faster.

Do you do them 120 feet up with lots of joints…

There is also 2 sides of the building that require being in a basket or some kind of swing stag. It has 3 story roofs on those sides.

Just to give ya an idea.


Highest we done them is about 80 feet. Cut them out, backer rod then caulk them.

Ever had to work out of baskets?