We do those all day long. Pricing is on you but figure 30 minutes per breezeway and 2 hours for the building. No lift. Those balconies will be easy since they are no knee walls. so two guys should be done in an hour and a half if they split it. I’d be happy with anything over $700
I’ve never really asked about your guys and set up. If you don’t mind break it down for me. One truck has 2 8 gpm machines? Do 5 or so building like this a day?Takes an hour or 2 a building? And that’s all they do is buildings like this?Feel free to tell me no by the way I’m not sure if it’s out of line to ask a question like that. I bet it took a great deal of time to build that up. Tons of respect!
On a building like that they park as close to the middle as they can. One guy goes left, one goes right. soap the far side to the middle of the building then rinse back to the far side. then thru the breezeway and wash across half the back. breezeway gets done on the way back to the truck since the hose is now stretched out. If they are garden style apartments with no breezeways, or breezeways are not being washed, one guy starts soaping while the others hooks up to the hydrant then starts rinsing behind the soaper. Soaper gets done first and starts rolling his hose up and moving water hoses to the next building.
Yes indeed. Actually, you take two Xjets and screw them together. The water force is multiplied exponentially by the compression of the two stage orifice effect.